Citizen Green
Well-Known Member
- Joined
- 8 Apr 2009
- Messages
- 7,407
Noted the Etihad Stadium & City crest weren’t lit up last night on the SS, needs sorting.
Noted the Etihad Stadium & City crest weren’t lit up last night on the SS, needs sorting.
I'm assuming that this will be a bridge of some that will be supported by the towers and hotel structure. There are no further supports to be added between the two as it will remain a through walkway.Looking at the plans, drone videos and photos one thing I can’t picture from what’s already assembled is how the hotel connects to the back of the stand towers.
Looking at the plans, drone videos and photos one thing I can’t picture from what’s already assembled is how the hotel connects to the back of the stand towers.
The buildings will be connected part way up to the towers so that there is a tunnel for people to pass through City Square without needing to walk all the way around.Looking at the plans, drone videos and photos one thing I can’t picture from what’s already assembled is how the hotel connects to the back of the stand towers.



Looking at the plans, drone videos and photos one thing I can’t picture from what’s already assembled is how the hotel connects to the back of the stand towers.
The floor highlighted in orange here is actually part of the hotel, and links to the rest of the top floor of the hotel. That's the rooms in the stand that look onto the pitch.
View attachment 125988
Here it is highlighted again over HC's section, onto the stand (ignore the blue).
View attachment 125989
The rooms out face like so.
View attachment 125991
Thank you and Hellocity. Got my head round it now. I suppose starting on the linking will be another landmark event.See below for the hotel bedroom floor with rooms onto the pitch. As Hellocity points out in his post above, the linking element has not yet started between the tower and the back of the concrete floor plates built so far.
Looks like they’ve gone backwards with this construction. Builders not tracking back etc.
Looks like they’ve gone backwards with this construction. Builders not tracking back etc.
No problem, you do plenty for us on here and I am grateful for the updates. It will be interesting to see what will have changed this week next time you get the drone in the air.No updates from me this week unfortunately , I’m working away until Saturday so will hopefully get one done on Sunday if the weather allows.
No updates from me this week unfortunately , I’m working away until Saturday so will hopefully get one done on Sunday if the weather allows.
It's just not good enough. You need to take a sabbatical until the project is complete.No updates from me this week unfortunately , I’m working away until Saturday so will hopefully get one done on Sunday if the weather allows.