North Stand Construction Discussion

These type of events at the Etihad are where the additional hotel stays bar match days and concerts at the Coop Live Arena are going to come from, especially with the new event and hospitality areas and offerings within the North stand redevelopment.

 
Fantastic picture! It gives a genuine scale and perspective of what to expect when you enter the fan zone, even without the roof on atm.
When walking in the last match we commented on how wide the area is, the renders make it look a lot narrower than the reality.
 
And still a third of that length to get bolted on to the end. Is it really just a bolted connection to take it to the end of the existing roof? Surely I'm missing something obvious there?

From @cpoverview s video.

View attachment 150420
Cable supports from the towers to each beam.
Also, I would think there maybe more steel work to go up at each side,ie above the side panels.
 
Last edited:
And still a third of that length to get bolted on to the end. Is it really just a bolted connection to take it to the end of the existing roof? Surely I'm missing something obvious there?

From @cpoverview s video.

View attachment 150420
The two cable towers will anchor them.

Watched the last one being delivered on Wednesday...MASSIVE !!
 
The two cable towers will anchor them.

Watched the last one being delivered on Wednesday...MASSIVE !!
Not directly as far as I can tell. Both the planning documents and the Design Statement only show the cables going to those anchor points at the end of the newly erected beams. That said I think half of the roof beyond that point may be translucent panels which presumably are lightweight.

Screenshot 2025-03-20 095428.png

Screenshot 2025-03-20 100147.png
 