Your commitment to the cause is amasing jrb, thank you.
The crane was still supporting the steel frame last night when I came back from town at 5pm. The crane workers and construction workers had gone home.
View attachment 138492
CP Overview drone video from yesterday.
Morning! Looks like the supporting crane has now been removed and the structure is now fully secured to the towers.
The crane was still supporting the steel frame last night when I came back from town at 5pm. The crane workers and construction workers had gone home.
View attachment 138492
CP Overview drone video from yesterday.
Would the next step be the longitudinal members at the front of the Skybar?Guess the next interestung bit of action to look out for when the skybar is fully built, would be when they position the cherry pickers on top of the two towers to build the quadpod supports.
View attachment 138507
I assumed these would be built on the ground and fitted as one piece , then the cherry picker used to transfer the cables ?? Or even a cradle on the end of the tower crane jib , whatever but I’m glad I’m not doing it !!Guess the next interestung bit of action to look out for when the skybar is fully built, would be when they position the cherry pickers on top of the two towers to build the quadpod supports.
View attachment 138507
Guess the next interestung bit of action to look out for when the skybar is fully built, would be when they position the cherry pickers on top of the two towers to build the quadpod supports.
View attachment 138507

Yea that's why I said when the skybar is built ;)Would the next step be the longitudinal members at the front of the Skybar?
It will be officially opened by Kun & Daveed as 'The 93.20 Stand'.The opening should feature a picture of Khaldoon and Pep on top of the roof ring of the sky-walk above the stand.
Rodders is going to be doing flying circuits of the stadium singing " who the fuck is vini junior " before doing a 30 metre knee slide in front of the Colin Bell stand.It got a bit tense with the nuts and bolts action around the battery change time, but we needn't have worried. After a swift re-powering of the drone, it was back to the nuts and bolts bodge job.
Great videos, always look forward to you update, especially as it will seem like a big change when we see the progress live before the Spurs game.
The should present Rodders his Ballon D'Or high up in those cherry pickers just as the final bolt goes in.
I don’t particularly mind heights but fuck that!Guess the next interestung bit of action to look out for when the skybar is fully built, would be when they position the cherry pickers on top of the two towers to build the quadpod supports.
View attachment 138507
Do you know how many levels of food/ beer outlets there will be.Guess the next interestung bit of action to look out for when the skybar is fully built, would be when they position the cherry pickers on top of the two towers to build the quadpod supports.
View attachment 138507
I don’t particularly mind heights but fuck that!
@ 3 mins does for me.
I would want a parachute.
Yeah I assume it will be a combination of crane in place and then join/check from a mewp on the tower.I assumed these would be built on the ground and fitted as one piece , then the cherry picker used to transfer the cables ?? Or even a cradle on the end of the tower crane jib , whatever but I’m glad I’m not doing it !!