North Stand Construction Discussion

The two cable towers will anchor them.

Watched the last one being delivered on Wednesday...MASSIVE !!
Not directly as far as I can tell. Both the planning documents and the Design Statement only show the cables going to those anchor points at the end of the newly erected beams. That said I think half of the roof beyond that point may be translucent panels which presumably are lightweight.

Screenshot 2025-03-20 095428.png

Screenshot 2025-03-20 100147.png
 
Not directly as far as I can tell. Both the planning documents and the Design Statement only show the cables going to those anchor points at the end of the newly erected beams. That said I think half of the roof beyond that point may be translucent panels which presumably are lightweight.

View attachment 150440

View attachment 150443
I thought that's what I'd described...the two huge frames at either end of the construction.....as explained by Sisk on Wednesday.
 
And still a third of that length to get bolted on to the end. Is it really just a bolted connection to take it to the end of the existing roof? Surely I'm missing something obvious there?

From @cpoverview s video.

View attachment 150420
Happolds do seem to really like their robust connections, there has been a theme of it all along here. On the tower, the transfers, corners, skybar etc. You can see there how beefy the ends of the beam connections are, and then the cross beam between them all is a hell of a depth too.

The cables when attached at roughly that junction will do their bit as well, but from what's on site it looks like the eyelets are on the 2/3rd section, so yeah appears it just comes down to the connection for that final third. So far at least, as far as visible at this point.
 
Last edited:
Not directly as far as I can tell. Both the planning documents and the Design Statement only show the cables going to those anchor points at the end of the newly erected beams. That said I think half of the roof beyond that point may be translucent panels which presumably are lightweight.

View attachment 150440

View attachment 150443
Posted before reading your following messages. I'm not sure people are getting the point you are making.

I agree, it (so far) looks like the end bits really will be just down to the connection. And although light as you point out, are still some length, and do support that segment of the rooftop walkway and viewing platform on the edge.

The fact they have built a gantry for mewps on top of the existing roof directly below exactly those points, suggests they are expecting a lot of work on the connections. Possibly even welding. Maybe.
 
Don't the new cables only go to the end of the new bits now up?

View attachment 150427
I wonder if the 1/3rd beams will have their own eyelet that 'interlocks' over those ones and then pivots down to meet the flat where it connects. Then the cable effectively hooks both. Possibly too far from the edge for that. One to watch.
 
I wonder if the 1/3rd beams will have their own eyelet that 'interlocks' over those ones and then pivots down to meet the flat where it connects. Then the cable effectively hooks both. Possibly too far from the edge for that. One to watch.
Looking back at images of the south stand it appears the same ie.the front extension pieces are bolted/ welded and the roof is a lightweight “see thru”construction
I wonder if the 1/3rd beams will have their own eyelet that 'interlocks' over those ones and then pivots down to meet the flat where it connects. Then the cable effectively hooks both. Possibly too far from the edge for that. One to watch.
 
3f379dcafefc965ce8841dc92f6f3c21.jpg

There are bolt holes on the top face as well as the end. I’ll bet it’s quite a hefty connection plate on both beams.
 
Looking forward to any insights gained from the Sisk Open Day event
Nothing radical that's not already in the public domain,but interesting and enjoyable.

Part of it is directed at school parties for advice on careers in the construction industry.

42 Manchester apprentices work on the project !!
 
So hinged from the cable connection? That's innovative thinking.
Hinged as well as bolted. But nothing to back that at all, just a thought.

From tailspin's spot, it Will be at least partly top interlocked/hinged just maybe involving the eyelet.
 
I've got to be honest.

The other Blue Moon forum members who were at the event this morning will confirm this.

Sisk asked everyone who was at the Open Doors event not to post any pictures and videos of the stand on social media, including fan forums. The pictures and videos taken from the viewing platform are NDA'd.

I wrote the questions on a piece paper that people on here and on SSC-MCR wanted me to ask Sisk. I've left the questions with Sisk. Sisk have promised to get back to me about the questions via email.

I've done a construction picture roundup which I'll post later today.
 
I've got to be honest.

The other Blue Moon forum members who were at the event this morning will confirm this.

Sisk asked everyone who was at the Open Doors event not to post any pictures and videos of the stand on social media, including fan forums. The pictures and videos taken from the viewing platform are NDA'd.

I wrote the questions on a piece paper that people on here and on SSC-MCR wanted me to ask Sisk. I've left the questions with Sisk. Sisk have promised to get back to me about the questions via email.

I've done a construction picture roundup which I'll post later today.
What were your own impressions of it?
 
What were your own impressions of it?

The event?

It was very informative. Carl from Sisk who hosted most of the event went into quite a lot of detail about how Sisk work as a construction company, and how they have constructed the stand so far, and what it has involved.

The Q&A session was very good. I've left the questions with Carl.

As for the views of the stand from the viewing platform, they were great.

It's just a shame the pictures can't be posted.
 
The event?

It was very informative. Carl from Sisk who hosted most of the event went into quite a lot of detail about how Sisk work as a construction company, and how they have constructed the stand so far, and what it has involved.

The Q&A session was very good. I've left the questions with Carl.

As for the views of the stand from the viewing platform, they were great.

It's just a shame the pictures can't be posted.
Carl Brierley? If so fair play to Sisk for not paying the event lip service.
 