Etihad Campus, Stadium and Collar Site Development Thread

A bit of crane action here for you all today,
Brunswick mill development, Bradford rd , miles platting
 

Attachments

  • IMG_3368.jpeg
    IMG_3368.jpeg
    209.1 KB · Views: 78
The development of the main stand to include filling in the corners and also loads more VIP hospitality would seem the logical next step for the ground. The additional seats in the corners can always be kept for match day and cater for standard tourists but the introduction of more top class VIP (take a look at the fulham stand) will create huge revenues for the club and hopefully also keep standard season tickets low

The roof is looking a bit tired and in the upcoming years will need some upgrade as it'll be close to 30 years old and we know the spirals and outside is not up to modern day standards. We have the blueprint for extending out and up as per North and South stands so we are very much talking about the art of the possible. This also fits in with our ethos of one stage at a time and see the results, still that said it would be good if the club was already thinking along the lines of improving this stand
 
The development of the main stand to include filling in the corners and also loads more VIP hospitality would seem the logical next step for the ground. The additional seats in the corners can always be kept for match day and cater for standard tourists but the introduction of more top class VIP (take a look at the fulham stand) will create huge revenues for the club and hopefully also keep standard season tickets low

The roof is looking a bit tired and in the upcoming years will need some upgrade as it'll be close to 30 years old and we know the spirals and outside is not up to modern day standards. We have the blueprint for extending out and up as per North and South stands so we are very much talking about the art of the possible. This also fits in with our ethos of one stage at a time and see the results, still that said it would be good if the club was already thinking along the lines of improving this stand
Doubt that anything major will be done for at least 10 years The E&W expansion, akin to the other two, will be far more challenging as the height is already up to the same as N&S stands Maybe they could find a way to flatten the top curve but, would it be worth the cost?
 
Doubt that anything major will be done for at least 10 years The E&W expansion, akin to the other two, will be far more challenging as the height is already up to the same as N&S stands Maybe they could find a way to flatten the top curve but, would it be worth the cost?

E&W stand renewals won’t be about capacity. They’ll add a bit it’ll be more about an upgrade of facilities. Could see an East Stand incorporating a hotel and or a conference venue.
 
E&W stand renewals won’t be about capacity. They’ll add a bit it’ll be more about an upgrade of facilities. Could see an East Stand incorporating a hotel and or a conference venue.

Depends what they’re doing.

You could argue they’ve already done a lot of the other stuff with tunnel club and all the other new premium seat offerings including Joes and 93:20. Almost all of the 2nd tier is premium seating of some sort on the sides.

Any major construction work will absolutely include & be about capacity with any further hotel or the like being separate from the stadium on the collar site.
 
E&W stand renewals won’t be about capacity. They’ll add a bit it’ll be more about an upgrade of facilities. Could see an East Stand incorporating a hotel and or a conference venue.
More likely to be the collar site Yeah would agree they badly need and up grade the L3 concourse is too narrow and not a lot they can do without structural changes and as the at the upper price point for GA then it is lacking
 
Just on way back from Prague. Amazing transport system with underground, trams and buses. Well cheap - £1.40 anywhere for 90 mins. Half that if over 60 and free if over 65 (I'll be back in a few years).

They also have these Trolleybuses which use the tram lines in the city, then take off like fck when they hit the open road. Well cool.

Someone from GMT should come out here to check it all out.
 
E&W stand renewals won’t be about capacity. They’ll add a bit it’ll be more about an upgrade of facilities. Could see an East Stand incorporating a hotel and or a conference venue.
Yes maybe get the east and west suspension roofs separated first, then build something like that on the east sttand
 
Just on way back from Prague. Amazing transport system with underground, trams and buses. Well cheap - £1.40 anywhere for 90 mins. Half that if over 60 and free if over 65 (I'll be back in a few years).

They also have these Trolleybuses which use the tram lines in the city, then take off like fck when they hit the open road. Well cool.

Someone from GMT should come out here to check it all out.
No chance! They'd have a few days on the piss and come back to say "not feasible"
 

Don't have an account? Register now and see fewer ads!

SIGN UP
Back
Top