Etihad Campus, Stadium and Collar Site Development Thread

"The two buildings" as in the new stand and hotel ?

Looking towards Joe Mercer Way

Would make sense to put the Museum and/or souvenir shop to the right, the hotel to the left(soil testing on the Collar site), and the covered City Square Plaza in-between them both, with a central atrium that leads through the City Square Plaza to and from Joe Mercer Way, with access to the Museum and/or the souvenir shop and the hotel, as well as access to the expanded North stand.

The Cafe, Summerbee bar and large shelters are all going.
 
Well, the two buildings are part of the extended stand. Either side of a covered City square.
Didn't read that before posting the above.

*Part of the extended stand*.

Interesting.

So the North stand is going to fan out backwards to accommodate those buildings?

Which 'could' imply a larger level 2, rather than a smaller 3rd tier expansion, similar to the South stand?
 
Didn't read that before posting the above.

*Part of the extended stand*.

Interesting.

So the North stand is going to fan out backwards to accommodate those buildings?

Which 'could' imply a larger level 2, rather than a smaller 3rd tier expansion, similar to the South stand?
I'm sure somebody posted the hotel and the conference centre are joined to the extended stand and come out from it as 2 wings with the covered plaza in beteween, rather than being built into the stand.
 
Didn't read that before posting the above.

*Part of the extended stand*.

Interesting.

So the North stand is going to fan out backwards to accommodate those buildings?

Which 'could' imply a larger level 2, rather than a smaller 3rd tier expansion, similar to the South stand?

The footprint of an expanded level 2 or additional level 3 would be the same due to the cable net restrictions. The top of the tier needs to finish up at the same point in both instances to allow the net to feed through between the tier and the roof.
 
I'm sure somebody posted the hotel and the conference centre are joined to the extended stand and come out from it as 2 wings with the covered plaza in beteween, rather than being built into the stand.

Maybe they’ll be twin towers on either side of, and joined up with, the new stand, creating an iconic visual. Would look great walking up Joe Mercer Way or coming from the tram stops. One tower contains a hotel and the other the shop & museum.

Like this on a bigger scale -

Wembley_Twin_Towers_%28retouched%29.jpg
 
I'm sure somebody posted the hotel and the conference centre are joined to the extended stand and come out from it as 2 wings with the covered plaza in beteween, rather than being built into the stand.

That makes sense.
 
The footprint of an expanded level 2 or additional level 3 would be the same due to the cable net restrictions. The top of the tier needs to finish up at the same point in both instances to allow the net to feed through between the tier and the roof.

I'm sure somebody posted the hotel and the conference centre are joined to the extended stand and come out from it as 2 wings with the covered plaza in beteween, rather than being built into the stand.

So the actual stand and roof pretty much stay the same, but are extended higher and further back, like the South stand, and the two buildings, the souvenir shop/museum and the hotel are incorporated seamlessly into the sides of the stand, fan outwards, and in-between those two buildings will be a linked and covered City Square?
 

Don't have an account? Register now and see fewer ads!

SIGN UP
Back
Top
  AdBlock Detected
Bluemoon relies on advertising to pay our hosting fees. Please support the site by disabling your ad blocking software to help keep the forum sustainable. Thanks.