Etihad Campus, Stadium and Collar Site Development Thread

IMG_20191004_203517.jpg


IMG_20191004_203501.jpg


@jrb
 
Is it still the case that any work on the stadium won’t start until the arena is done?

I was told arena first, build up demand and then stand. They want it so we are getting 54,000 midweeks regularly until they do it. Will be 3/4 years I would expect but will happen.
 
Website is live.

Worsley Web was spot on about the location on the Etihad Campus.

Originally posted by mcr guy on SSC MCR.

02-CD556-C-1-AAF-4331-83-B9-CC2-FF8-D0-A0-A7.jpg


D10-DB4-E4-4-E5-F-4-FBF-A739-92-D32-C69-FC4-D.jpg


https://www.eastlandsarena-consult.com/

Consultations start tonight at the Velodrome...


Come and meet us
We would like to invite you to one of our community consultation drop-in sessions to meet us and find out more about our early stage plans.

The details:

  1. Monday 14 October 2019, 2:30pm to 8pm – The Foyer at the HSBC UK National Cycling Centre, Stuart Street, Manchester, M11 4DQ
  2. Tuesday 15 October 2019, 2:30pm to 7pm – Bridge 5 Mill, 22A Beswick Street, Manchester, M4 7HR
  3. Wednesday 16 October 2019, 10:30am to 1pm – Miles Platting Community Library, Victoria Mill Community Centre, Lower Vickers Street, Manchester, M40 7LJ
  4. Thursday 17 October 2019, 2:30pm to 7pm – Beswick Library, 60 Grey Mare Lane, Manchester, M11 3DS
 
  • Like
Reactions: jrb
Forgot the public consultation was on Today.

Will nip down tomorrow. Hopefully there will be some other images on view? ;-) Will ask a few questions.
 
Website is live.

Worsley Web was spot on about the location on the Etihad Campus.

Originally posted by mcr guy on SSC MCR.

02-CD556-C-1-AAF-4331-83-B9-CC2-FF8-D0-A0-A7.jpg


D10-DB4-E4-4-E5-F-4-FBF-A739-92-D32-C69-FC4-D.jpg


https://www.eastlandsarena-consult.com/

The sketch picture is as if you are looking north eastwards from Joe Mercer's mosaic, on Joe Mercer Way.

The ground floor to the left will be for things like bars, cafes and restaurants. Available for match day socialising.
 
Last edited:
I was told arena first, build up demand and then stand. They want it so we are getting 54,000 midweeks regularly until they do it. Will be 3/4 years I would expect but will happen.

I wouldn’t be surprised if the design evolved and we ended up with a large single tier stand instead. I’m sure the wait will be worth it.
 
I was at the stadium this morning to sort out a problem with my season card. As I walked back to my car on The North Car Park I noticed that some work has already started on the proposed site (where the BMX type place used to be).
At least 3/4 drilling/boring machines,a couple of bulldozers and a uni-mog type of vehicle.
Looks like some preliminary work may have already begun.
 
They are looking to use the venue about 120 times a year.

A mix of concert and sporting events. Things like Basketball, Gymnastics, Tennis, Boxing and UFC. Some award ceremonies as well.
 
Forgot the public consultation was on Today.

Will nip down tomorrow. Hopefully there will be some other images on view? ;-) Will ask a few questions.
Have been over earlier today they have only the same artists impression that is in your earlier post.
 
I saw soil tests being done on proposed area as far back as the day after the Vincent Kompany Testimonial. This will be great for East Manchester.
I was at the stadium this morning to sort out a problem with my season card. As I walked back to my car on The North Car Park I noticed that some work has already started on the proposed site (where the BMX type place used to be).
At least 3/4 drilling/boring machines,a couple of bulldozers and a uni-mog type of vehicle.
Looks like some preliminary work may have already begun.
 