North Stand Construction Discussion

Is there another tower still to be built at the front of the right hand ‘claw’ as you look at the stadium?

There are two concrete cores in the office block wing, yes. Roughly in line with the two inner cores of the hotel block.

They haven't been started yet, not even at pit level. They seem to be using that whole area to sort and lay out materials.
 
There are two concrete cores in the office block wing, yes. Roughly in line with the two inner cores of the hotel block.

They haven't been started yet, not even at pit level. They seem to be using that whole area to sort and lay out materials.

Am I right that there’s another crane going in for the shop/office development as well?
 