North Stand Construction Discussion

I’m looking forward to seeing the progress at the Spurs game, basically a full month since our last home game so think we’ll see the biggest difference for some while.
 
The beams on the left and right hand side of the Skybar crossmember assembly look temporary (only coated in red oxide paint). They appear to replicate the top uprights already installed on the two towers. It's going to be a challenge mating six location flanges up whilst that massive frame is suspended from the crane!

Anyway, a few more pictures.
IMG_3993.JPEG
IMG_3994.JPEG
IMG_3996.JPEG
 
The beams on the left and right hand side of the Skybar crossmember assembly look temporary (only coated in red oxide paint). They appear to replicate the top uprights already installed on the two towers. It's going to be a challenge mating six location flanges up whilst that massive frame is suspended from the crane!

Anyway, a few more pictures.

That's what it looks like, be interesting seeing them do it all.
 
The beams on the left and right hand side of the Skybar crossmember assembly look temporary (only coated in red oxide paint). They appear to replicate the top uprights already installed on the two towers. It's going to be a challenge mating six location flanges up whilst that massive frame is suspended from the crane!

Anyway, a few more pictures.
View attachment 137295
View attachment 137296
View attachment 137297
My Meccano set never had that many pieces - I am jealous!
 
The second tower is half connected to the base by the looks of it - one more piece to plug in and both towers will be fully attached to the ground! I guess that will be pre-requisite of hanging that huge new frame (currently sat on the ground) between the towers
 