North Stand Construction Discussion

MOST will not have had the pleasure of the old scoreboard end.
I had to wear shorts even on the coldest February days, sat on a freezing concrete wall.
When we moved to the Platt lane, it was luxury to sit on a shiny plank, despite the odd arse splinter.
Probably why the Pep stand seems space age for FOC's like me
I remember looking up at the metal staircase to the top of the Platt Lane before ascending. At the age of about 8 it seemed massive. A year later i was walking up the real Wembley way.
 
I remember looking up at the metal staircase to the top of the Platt Lane before ascending. At the age of about 8 it seemed massive. A year later i was walking up the real Wembley way.

It is strange those visual memories of a football ground when a young child. I remember those stairs, and the shiny blue planks we used to sit on.
 
I remember watching a home game for Notts County as a student. Whenever there was a moment of excitement (quite rare) the wooden stand used to vibrate. the County Ground was next door to an Abbattoir, and I wondered if that would be where I would meet my maker.
 
At the Etihad.

Loads of activity across the construction site.

Took some pictures.

Something interesting, looks like a huge beige curtain is being fitted to the side of the fan zone steel roof structure.
 
At the north end facing Joe Mercer Way?

As you look towards the fan zone, the curtain or whatever it is, is being installed at the back of the fan zone, on the left side, in-between the steel roof and the hotel. I’ll post the pictures in a bit.

There’s also a concrete post/structure being built under ground (atm), opposite the side of the hotel, where the access road will be to and from the hotel.
 
Those metal parts laid out along the edge of the new fan roof look like rainwater gutters and the clue is pieces on the floor with down pipes attached to them.
Yes if you watch the ssskies video the first 2 sections on each side nearest the stadium are already in place :-)
 
Went down to the stadium this morning. The roof in the new square is pretty high. Can see lots of people getting wet if the wind is blowing the rain down Joe mercer way!
 
This Afternoon.

Right side.

DSC00418.jpg


DSC00423.jpg


Working on the concourses.

I'll post pictures from the test event showing that area of the courses and the work that needs to be done.

DSC00419.jpg


Beige curtains/cloths are being hung from the steel roof trusses inside the fan zone.

Has anyone got an idea what they are being used for?

DSC00420.jpg


DSC00421.jpg


DSC00422.jpg


DSC00456.jpg


DSC00424.jpg


DSC00425.jpg


DSC00426.jpg
 

Don't have an account? Register now and see fewer ads!

SIGN UP
Back
Top