Underwhelming or not, having a commercial aspect makes sound business sense as it drives a more consistent revenue stream. Would be great to see an addition to the tech/digital centred thinking we've seen with Circle Square.Sounds new to me sounds some what underwhelming in the sense that’s it’s not like the tourist stuff we where wanting but maybe that comes in time or other areas.scale of what you mention sounds good depends on the scale I mean the strip of land you mention is big but not that big not clear where the rest will be could be all over from what you say so not sure how that’s incorporated into the campus from what you say. The scale of that sounds impressive
Unlike the log flume obviously.Exactly that, just a rumour, that was never a serious rumour.
Development at the Oval Cricket Ground.Nice chat with someone that knows yesterday, and its probably not new news really but i’ll share anyway
The north stand expansion and eateries/bar (new city square) linking to the arena is only the start of a 9 year plan.
Next faze is to develop all the land at the back of joe mercer way, including the land where the gas thing is. The intention is to have a commercial area that will house all the top advertising, design, architects, legal companies of the north. A proper intellectual hub. Working title of that area is The North. Be hotels etc too. A small Town within manchester is the aim.
Every bit of land is going to be bought up that comes available
Underwhelming or not, having a commercial aspect makes sound business sense as it drives a more consistent revenue stream. Would be great to see an addition to the tech/digital centred thinking we've seen with Circle Square.
The big open bar ?Not really. Hes very much on the inside but i dont put him in too much of an awkward situation and just let him tell me what he wants to tell me
Just really that there is no limit to what can be achieved with the collar site.
Another thing, all bars in the stadium will eventually be upgraded to match the one in the south stand
Staggering that they have built a multi million pound building in the Rainy City and not accounted for water gatheringwas told by a friend working on this that the walls are crumbling due to the water collecting on the top of the building.
Walls need replacing and a real problem for the planned opening.
Wouldn't be surprised if it was because the building wasnt made watertight to programme, last time i walked site it was pissing in.Staggering that they have built a multi million pound building in the Rainy City and not accounted for water gathering
was told by a friend working on this that the walls are crumbling due to the water collecting on the top of the building.
Walls need replacing and a real problem for the planned opening.
Just like our council doing things in style.
I believe this is just Chinese whispers. Its highly unlikely given the design and planning of a building of this scale these days.was told by a friend working on this that the walls are crumbling due to the water collecting on the top of the building.
Walls need replacing and a real problem for the planned opening.
I believe this is just Chinese whispers. Its highly unlikely given the design and planning of a building of this scale these days.
I didn't mean he was lying, just stories get changed as they get told sometimes. What im trying to say is that having been involved in the construction of numerous large buildings over the past 30 years, albeit at the very early stages of foundation design. I have a good idea of the level of work and detail that goes into these projects , and to have to rebuild walls or whatever due to water ingress would be a massive failing in the design and construction process. I'm not saying these sorts of things don't happen but they are extremely rare.Can't see him lying about it, as its him changing his job to work on this site. (currently working on the massive transport hub redevelopment in Stockport)
Starting this contract in a few weeks so soon see if he's lying or not.
It's never going to open on time in April this year anyway! Talking to a workman the other day and he said there miles behind on it due to problems getting materials through from Europe, discussion on working throught the night have already taken place !I didn't mean he was lying, just stories get changed as they get told sometimes. What im trying to say is that having been involved in the construction of numerous large buildings over the past 30 years, albeit at the very early stages of foundation design. I have a good idea of the level of work and detail that goes into these projects , and to have to rebuild walls or whatever due to water ingress would be a massive failing in the design and construction process. I'm not saying these sorts of things don't happen but they are extremely rare.