North Stand Construction Discussion

Is level 8 not the roof ??

No it is 8, and then the roof on top.

But not the entire thing, only on the north to south claw, the side leg is one storey lower.

Ground and 1st foor are effectively 3 storeys in height over two levels, so the effective height of the whole thing is comparable to a 10 storey building, at 32m tall. Excluding lift and stair overruns.

The museum/office block is a similar height, but without the side leg.
 
Last edited:
No it is 8, and then the roof on top.

But not the entire thing, only on the north to south claw, the side leg is one storey lower.

Ground and 1st foor are effectively 3 storeys in height over two levels, so the effective height of the ehole thing is comparable to a 10 storey building, at 32m tall. Excluding lift and stair overruns.

The museum/office block is a similar height, but without the side leg.
Correct I have just looked at the planning application.
 
Think there will be a topping out party pretty soon.

I was thinking about this back when the PA came out.

What point do they take as the topping out in this one?

Or do they have one for the hotel, one for the museum/office block and one for the stand.
 
I just wish the club would offer 3k seats to the U25s as season tickets in the north stand, the atmosphere there would challenge the South stand.
The South stand does well most games it is not them that needs a challenge it is the rest of the Stadium who need to but into it.
That is a great idea by the way I'm pretty sure if you had the old stadium standing layout there would be more than 3000 under 25's together.
 
I was under the impression that the new NS would open at the start of next season, albeit with maybe the first few games away to give more finishing time. However several posts on here and maybe an ambiguous one from the club say it will be some time in next season rather than the start.

When I moved into SS3 at the start of the season it was still being worked on for months afterwards so why won't that be the case with this new stand?
 
I was under the impression that the new NS would open at the start of next season, albeit with maybe the first few games away to give more finishing time. However several posts on here and maybe an ambiguous one from the club say it will be some time in next season rather than the start.

When I moved into SS3 at the start of the season it was still being worked on for months afterwards so why won't that be the case with this new stand?
Don't think it's supposed to be ready until November,and may well over run that date.Not expecting any fans in it until after the new year myself.
 