You suggested that the cablenet could be removed when the north stand is developed to remove the restrictions caused by the cable net being in place! With the east and west stands being supported by the current structure, spiral masts, without the cable net even though the cable ring is primary structure. I asked how the south stand roof is supported without the cable net you explained the tubular structures bolted to the steel verticals, fair enough but the cablenet system, if not the prestensioned ring, is still in use the ring passes through the structure.
So ultimate it’s highly unlikely that the cable ring, cablenet, can be removed unless new roof structures are installed for the east and west stands
Jesus Christ mate.
I speculated it on the basis that the current cable ring restrictions wouldn’t allow us to reach the rumoured 63k through an extended North Stand 2nd tier. I too believe that wouldn’t be likely but I made the point based on that capacity goal and people at the meeting being told the cable net wouldn’t be an issue with development.
I then corrected you on the new South Stand roof on if it uses the old ring support or not. It doesn’t.