supercity88
Well-Known Member
- Joined
- 9 Aug 2009
- Messages
- 13,841
When you’re inside the bowl of our stadium, it’s lovely. The concourses have really come on over the years n’all.
But for what is now the world’s leading sporting club, the outside of the stadium and surrounding grounds of our stadium are bloody ugly.
There are a few shots later on in that video where he’s at the other end of the ground to the construction end, and it looks as done-in and scruffy as the end that’s just had a load of demolition done to it.
View attachment 95489
View attachment 95490
And what a waste of space that car park out the back of the East Stand is (as well as where the old Mercedes garage is over the other side).
Considering what we all have been speculating for what would be built around our stadium for the last 15 years since the takeover (that original thread was the reason I started reading bluemoon-mcfc), I imagined things would have moved a lot faster, on a grander scale and much more high class than they have with regards to the surrounding grounds.
Looking forward to 2025 when the arena and the North Stand have all been completed. It will feel like it’s all starting to get moving around the outside of the stadium then. I wonder what the next 15 years will hold for the area around the stadium after that?
The public realm is key. It's all very grey and very dull. Wrapping some banners around the spirals is about all they've done to try and brighten it up. The South Stand expansion had images of curtain glazing and screens which could light up and help build atmosphere for night games. I'm sure there will be plans to enhance the external image of the stadium. That might be Phase 3 when they look at tackling the side stands, which I'm sure they will. We might have to wait a while longer for improvements to the rest of the public realm as a result.
But some smart block paving, tree planting and just a little imagination would go a long way to help creating a really special stadium externally whilst they wait to do those works.
As a business though you just wouldn't put money into something that is planned to change in the future, and as I said I think the end goal will be something we want to see, but we'll have to wait for the side stands and pushing the capacity up to 80k for it to happen. Otherwise it's all temporary and will be damaged by construction.