Allowing say 5weeks to finish the concrete floors and roof on the “office”that hopefully will allow the delivery and on-site fabrication of the 4 roof beams we should be in a position to erect the steelwork for the link to the standThat linking piece can't be done until the roof beams at least are up as it's used for storage for them prior to the lift.