North Stand Construction Discussion

Does this mean a bigger sail than the fin @Coatigan
I don't know one way or the other, but I don't think so. Nothing to suggest that at least, other than the WATG tender drawings seem to show them somewhat deeper than the PA drawings.

The mock-up panel would show a segment of the sails, at the narrower end, so how deep they'd get at it's widest point we won't really know. But we Will see the colour of the horizontal bands though!
 
Why concrete jrb? Rest being steel. Is the concrete for say lift shafts?

Concrete for the cores at the very least. Although I think the hotel will also be built in-situ concrete columns and slabs, linking to the steel towers, that's what it looks like. The office too would would make sense, but too early to tell.
 
Looks like they’ll be moving the access way along soon, now that they’ve constructed a wider path next to the squash centre. This will allow them to start on the wing which will house the club shop, museum and offices.

IMG_9650.jpeg
 

Don't have an account? Register now and see fewer ads!

SIGN UP
Back
Top
  AdBlock Detected
Bluemoon relies on advertising to pay our hosting fees. Please support the site by disabling your ad blocking software to help keep the forum sustainable. Thanks.