Pretty much exactly the same. The outer ones match the position of the cells in the photo, and access to them.Seems slightly different to what they've done on the South Stand
View attachment 136468

Which is drainage. As others have said.I'm with DiscoSteve on this one. The cylinders align with new rainwater ducts coming down from the roof. They'll probably be wrapped in something more elaborate to finish them off.
View attachment 136470
Have you not heard?Still not finished? What the fuck are they doing all day; drinking tea and doing the crossword?
#116Have you not heard?
6000 migrent workers have died building this stand. Recruitment is slow.
Great pictures JRB.I've gone a bit OTT with the Hotel pictures.
As you can see from the pictures the 8th and final concrete floor is not far from completion.
![]()
How big is the hotel ? compared to others etc ?
Good work young man.
Is level 8 not the roof ??Great pictures JRB.
I think the hotel floors go G, 1, 2, 3, 4, 5, 6, 7, 8.
So they are currently on floor 7 and will have just one more floor after that.
Don't think so, but could be wrong. I am not flammable.Is level 8 not the roof ??