Hi Everyone, here is my latest video, near 4hr round trip but pictures look amazing. Cheers
Thanks Tailspin747 I won't be back there till Friday now, but CP Overview will be there Thursday. CheersAnother great video and really appreciated [emoji106] I’m sure you’ll catch them doing a major lift soon.
Great videos, but mate you've got to bin that fucking intro music though, fucking hell. Gets every time.Thanks Tailspin747 I won't be back there till Friday now, but CP Overview will be there Thursday. Cheers
Hi Coatigan, I try and put the volume low on that, will come up with a different intro or just eith now sound to it. CheersGreat videos, but mate you've got to bin that fucking intro music though, fucking hell. Gets every time.
I usually just drop a couple of E’s in anticipation of it coming on :-)Great videos, but mate you've got to bin that fucking intro music though, fucking hell. Gets every time.
The feng shui is going to be all off, just like Maine Road, and we’re going to win fuck all again for another 35 years.Zoom in.
This picture really shows how high the new North stand roof will be compared to the current North stand roof, and the roofs on the Colin Bell stand and East stand.
View attachment 148713
Hi Everyone, here is my latest video, near 4hr round trip but pictures look amazing. Cheers
Thanks DiscoSteve cheersepic video again, look forward to both yours and colins now!
That was just to balance the Dave Watson Gap on the other side of the North Stand!It's OK, a new Gene Kelly stand is going to be shoehorned into one of the corners with the spare scaffolding left over after the North stand is finished.
View attachment 148718
It was discussed recently (by others) with the consensus being the club are holding back on any announcement until the roof is or at least confirmed as being on target, time wise.If the stand opens half way through next season, who is going to occupy it? Will they be match day tickets or FCFS tickets of what? Are they going part year season cards from a specific date?
No "Health & Safety" in those days?It's OK, a new Gene Kelly stand is going to be shoehorned into one of the corners with the spare scaffolding left over after the North stand is finished.
View attachment 148718

Helpful info mate. I think what the timetabling / ticket price engagement link is is that Danny Wilson has said (previously) that City will engage with fans groups / fans on tickets for the expanded North Stand when the current phase work on the roof is done. I think that’s the new roof structure that apparently needs to be up this month according to current timescales (but they might not be so important like you say).The roof won’t make much difference. At the end of the day it needs to be there for North Stand level 1 and the OG level 2 by the time the first game starts in August.
The only time they can take down the original roof is during the close season because they need mobile cranes on the pitch to do it and these will cause some damage to the pitch so the work also needs to be concluded several weeks before the new season starts.
Expect all the initial roof beams to be in place before the end of April and perhaps even cabled up by then as well.
View attachment 148726