A bit dated, the beginning of April, but a good drone video of the Stay City Hotel concrete core on Deansgate.

 
Trinity Islands.

First of the four towers already making a visible impact on the Manchester skyline.

Contributor:
Bardhok Ndoji / Alamy Stock

IMG_0977.jpeg

IMG_0978.jpeg
 
Leroy Bello - Linkedin

Amazing to see the last Piling section going in for our new build project in Manchester town centre 1NQ (behind One Port Street)

IMG_0989.jpeg

IMG_0990.jpeg
 
For those of you interested in piling.

Volker Ground Engineering - LinkedIn

VolkerGround Engineering has recently completed a job for a valued client in Manchester where they are developing a new residential apartment block in Ancoats, a busy commercial area of Manchester bound by car parks, hotels and business premises. Our scope of works included the design and construction of 133, 450mm diameter bearing piles up to 23m long and 65, 600mm diameter contiguous piles up to 12m long, penetrating into the underlying sandstone where loads dictated.

Air injection was used to assist the boring into the sandstone, keeping the auger free from debris and enabling the team to drill more efficiently, increasing productivity for the installation with our Soilmec SR75 piling rig.

Piling adjacent to a listed office building, the team undertook vibration monitoring to ensure the works were not impactful to the existing structure. On this heavily constrained site, the piles were extremely concentrated and required careful phasing to ensure freshly cast piles were not damaged throughout construction.

A high standard of measures ensured the safety of the site teams, resulting in an accident and incident free delivery.

IMG_0991.jpeg
 
Greenheys - 7 fls - Lab & Office - Manchester Science Park.

Wayne Adams.

Another day in piling heaven. 2 rigs for the price of one in Manchester.
Gathering pace now.

Thanks to both crews and the steel fixers that are just managing to keep up.

IMG_0992.jpeg

IMG_0993.jpeg

IMG_0998.jpeg

 
Last edited:
Brentwood - Twitter

Stretford Shooping Mall redevelopment.

The car park ramp removal is well underway and is expected to be complete by the end of the month.Our development team is also working behind the scenes to improve security, accessibility, safety and aesthetics.

IMG_0994.jpeg

IMG_0997.jpeg

A bit dated.

 
RWinvest- Linkedin

Construction Update at Embankment Exchange!

This period has seen great progress made for both the Irwell and Greengate buildings with a key focus on progression of their external facades.

This has included Installation of insulation, brick slips and cladding panels.

IMG_0981.jpeg

IMG_0982.jpeg
IMG_0984.jpeg

IMG_0983.jpeg
 
Screen grabbed from the latest North stand drone construction video by SS Skies posted by Norman on the North stand expansion thread.

With another 10-20 towers proposed and going up in the next 5 years, the Manchester skyline will look fantastic considering the size, population and economy of Manchester.

IMG_1003.jpeg
 
Eric Wright Construction has started building an 89-apartment development on Laystall Street for Great Places Housing Group.

The £20m Manchester development will provide a mix of one- and two-bedroom apartments available for rent-to-buy and social rent.


IMG_1007.jpeg

 
McCrory Holdings - Linkedin

We’re wrapping things up at the Bankside, Colliers Yard project! Our masonry package is nearly complete, and the transformation is truly remarkable! As the scaffolding comes down, our flawless brickwork takes centre stage.

IMG_1008.jpeg

IMG_1009.jpeg

IMG_1010.jpeg

IMG_1011.jpeg
 
Renaissance Associates Ltd - Linkedin

We were out on-site last week at Waterhouse Gardens and it’s great to see the continued progress.

Key updates include:

Approx: 1200 piles are now installed for the whole site.
The 84m tall Block A core is topped off.
Screens are being installed.
Work continues to progress with upper levels for block A,C and D

IMG_1012.jpeg

IMG_1015.jpeg

IMG_1014.jpeg

IMG_1016.jpeg
 
Torsion Group - Linkedin

PROJECT UPDATE: One Victoria, Manchester

Maintaining a focus on project completion has helped our team at One Victoria, Manchester, achieve a significant milestone: both Blocks A and B are about to reach topping out.

Block A reinforced concrete frame has progressed to level 10, with parapet walls being formed. Block B reinforced concrete frame to level 10 was completed at the beginning of April.

The ground floor blockwork is 50% complete on both blocks, including the car park, water tank room, and LV room on Block B.

The focus over the next 6 weeks will be completing the substation at Block A.

While topping out blocks A and B is visible to everyone, much work has been going on behind the scenes. Internal first fix MEP, soil vent pipes, rainwater downpipes, and ducting are now complete.

Block B is now progressing with frames and glazing installed up to level 4, SFS steel and cement board up to level 6, and frames and glazing installed up to level 4.

Safe access has also been installed, commissioned and in use, including that for Great Ducie Street and Breslynn Street.

Great to see lots of progress on this new 129 residential apartment development in the heart of Manchester for our client One Heritage Group PLC.

IMG_1020.jpeg

IMG_1019.jpeg

IMG_1018.jpeg

IMG_1017.jpeg
 
Katy Simpson - Linkedin

Update on Owens Park, Fallowfield

Many of our alumni will be interested to hear that scaffolding has now gone up on the Owens Park Tower as demolition work gets underway at this Manchester landmark.

The Tower is coming down to make way for new, sustainable accommodation for future students, but before it does we want to celebrate the many memories and lifelong friendships that were made there.

IMG_1021.jpeg
 
Click the link below for the timelapse of the demolition.

Austin Wilkinson - Linkedin

Thanks to Sky Revolutions for providing AW Demolition Ltd with the Time Lapse Video of the Demolition at our Manchester City Centre project for Dominus Real Estate & Whitbread!

In its place.

Still to secure funding, which shouldn’t be a problem.

Greystar is in talks with Dominus and Whitbread to forward fund a £200m scheme on One Medlock Street, Manchester.

The site has planning consent for 1,014 student beds, as well as 387,500 sq ft of office space, granted

IMG_1022.jpeg

IMG_1023.jpeg

IMG_1024.jpeg


 
The (newish) apartments, forgot their name, fronting the River Irwell are absolutely shocking for such a prime site. Look at the ground and river front interaction.

Click on the link below.

Mark L - Linkedin

Manchester provided perfect conditions yesterday to complete a client project—a view from The Meadows in salford to the Manchester City skyline.

360 Panoramas can highlight the geographical location of any property or development.

Panos can be embedded to your website

Drop me a DM if you are interested.

Check my bio for more aerial photography and film.

IMG_1026.jpeg

 
Last edited:
Katy Simpson - Linkedin

Update on Owens Park, Fallowfield

Many of our alumni will be interested to hear that scaffolding has now gone up on the Owens Park Tower as demolition work gets underway at this Manchester landmark.

The Tower is coming down to make way for new, sustainable accommodation for future students, but before it does we want to celebrate the many memories and lifelong friendships that were made there.

View attachment 116631

And a lot of shagging - lost my virginity in there the day we beat Spurs 5-2
 
  • Like
Reactions: jrb
McGoff Construction - Linkedin

D O W N T O W N • V I C T O R I A • N O R T H • P R O G R E S S

Works are progressing at pace at our Downtown Victoria North scheme on Rochdale Road, Manchester.

We now have around 90 people on site with over 13,000 man hours of work delivered this month!

The Block 2 slipform core has reached Level 9 of 12 with foundations, internal drainage and ground floor slab progressing.

On Block 1 the basement slab, retaining walls and columns are all in progress. Blocks 3 and 4 foundations are nearing completion.

IMG_1028.jpeg

IMG_1027.jpeg
 
Katy Simpson - Linkedin

Update on Owens Park, Fallowfield

Many of our alumni will be interested to hear that scaffolding has now gone up on the Owens Park Tower as demolition work gets underway at this Manchester landmark.

The Tower is coming down to make way for new, sustainable accommodation for future students, but before it does we want to celebrate the many memories and lifelong friendships that were made there.

View attachment 116631
They better not touch the toast rack!
 

Don't have an account? Register now and see fewer ads!

SIGN UP
Back
Top