North Stand Construction Discussion

It definitely looks like it’s ready to go. They really do have a way of making major lifts when nobody is around to capture them
emoji106.png

Is it me , or the angle , but it looks very short ??
 
View attachment 148663
Cropped this from sskies video #2 yesterday - what an absolute stinking mess of wires and cables up there, I hadn't realised that 4 of the 6 temporary poles are split to go around the existing cablenet support wires, literally the cablenet wires thread through the middle of the yellow poles!
Structural Reverse Kerplunk.
 
Is it me , or the angle , but it looks very short ??
There is another 3rd of it to go. I pointed that out when they were on the ground, they seem to be only doing that to the point of the brace between them, the big cross span below. Think they'll do the final third once they connect them, and the last bit needs connected to the cables.

Screenshot_20250207_143240_Drive~01.jpg
 
There is another 3rd of it to go. I pointed that out when they were on the ground, they seem to be only doing that to the point of the brace between them, the big cross span below. Think they'll do the final third once they connect them, and the last bit needs connected to the cables.

View attachment 148675
Thank you coatigan makes sense now !
 
There is another 3rd of it to go. I pointed that out when they were on the ground, they seem to be only doing that to the point of the brace between them, the big cross span below. Think they'll do the final third once they connect them, and the last bit needs connected to the cables.

View attachment 148675

Why do you think they’ve not done the full beams? I think they did with the south stand. I’m wondering when they will even attach the front part.
 

Don't have an account? Register now and see fewer ads!

SIGN UP
Back
Top