HelloCity
Well-Known Member
It looks bloody massive to me.
I think he’s saying that it looks like it wouldn’t reach the front of level 1 but as has been said, it might be the angle…!
It looks bloody massive to me.
So another third in length will be added in-situ ?Two thirds of one section going up.
View attachment 148672
I think that will be an ecumenical matter, Dougal.So another third in length will be added in-situ ?
Sorry don’t get that apart from sisk and father ted are both Irish ?? Or am I missing something obvious ??I think that will be an ecumenical matter, Dougal.
Structural Reverse Kerplunk.View attachment 148663
Cropped this from sskies video #2 yesterday - what an absolute stinking mess of wires and cables up there, I hadn't realised that 4 of the 6 temporary poles are split to go around the existing cablenet support wires, literally the cablenet wires thread through the middle of the yellow poles!
Feck it.Sorry don’t get that apart from sisk and father ted are both Irish ?? Or am I missing something obvious ??
There is another 3rd of it to go. I pointed that out when they were on the ground, they seem to be only doing that to the point of the brace between them, the big cross span below. Think they'll do the final third once they connect them, and the last bit needs connected to the cables.Is it me , or the angle , but it looks very short ??

Some poor ****'s gonna have to walk along that beam between those rails soon.Just happened now
View attachment 148668
Thank you coatigan makes sense now !There is another 3rd of it to go. I pointed that out when they were on the ground, they seem to be only doing that to the point of the brace between them, the big cross span below. Think they'll do the final third once they connect them, and the last bit needs connected to the cables.
View attachment 148675
Do you think they'll have to have something on the pitch to lift and steady the final thirds of each beam?Some poor ****'s gonna have to walk along that beam between those rails soon.
yes indeed , bad photo because of the sun but you can see someone doing exactly thatSome poor ****'s gonna have to walk along that beam between those rails soon.
There is another 3rd of it to go. I pointed that out when they were on the ground, they seem to be only doing that to the point of the brace between them, the big cross span below. Think they'll do the final third once they connect them, and the last bit needs connected to the cables.
View attachment 148675
Great shot and good for a sense of scale too.yes indeed , bad photo because of the sun but you can see someone doing exactly that
No, you hit the rivet on the head.Sorry don’t get that apart from sisk and father ted are both Irish ?? Or am I missing something obvious ??
The sun? In Manchester? As a certain individual, who's been in the news lately, would say; fake news.yes indeed , bad photo because of the sun but you can see someone doing exactly that
Two thirds of one section going up.
View attachment 148672
Why do you think they’ve not done the full beams? I think they did with the south stand. I’m wondering when they will even attach the front part.
For me, Lego lost its way after doing kits with instructions. In the old days kids used their imagination. Hope this project has instructions and appropriate kits though.Lego is so much more technical now, than it used to be.